Can anyone assist. I am currently designing a clean room and have done all the calcs. Taking into account the door leakages and stabiliser flow rates, the overall flow rate exceeds the duty of the existing AHU plant.
The only way I can see to reduce the duty requirement on the main Air Handling Unit is to use recirculating fan-filter units. I have tried finding out who supplies these but I have had little success. The sort I mean fit in a ceiling space with an inlet/outlet connection and a HEPA filter...with possibly a heater/cooler battery.
Can anyone help? A UK supplier if possible please...(but if not, I can always ring them and ask for an import cost)
Yours in anticipation
Friar Tuck of Sherwood
The only way I can see to reduce the duty requirement on the main Air Handling Unit is to use recirculating fan-filter units. I have tried finding out who supplies these but I have had little success. The sort I mean fit in a ceiling space with an inlet/outlet connection and a HEPA filter...with possibly a heater/cooler battery.
Can anyone help? A UK supplier if possible please...(but if not, I can always ring them and ask for an import cost)
Yours in anticipation
Friar Tuck of Sherwood