Hi All,

There are a couple of Tie-in/Closure joints to be welded in the project, I am involved right now. No possibility of Leak test/Hydrotest.
Project spec is ASME B31.3(100% RT),and
I would like to know is there any requirement of UT and cut bevel MT/UT,additional to RT specified by the Code.
I couldn't see that requirement in B31.3..am I right..

I have done earlier UT,cut bevel MT additional to RT in other projects,but that was as per project spec.

Thanks
 
Replies continue below

Recommended for you

What materials are being welded together?

For the old-to-new piping welds it's good practice to UT the old piping before cutting just to ensure proper wall thickness for welding. After the cut, PT the prep/bevel on the old piping as well as the root weld. Then, RT the final.

I'll see if I can find it documented. Hope this helps.
 

Thanks Bonswa.
Thats a good engineering practice,you mentioned.The project specs usually mention the same. However, I couldn't see the same in ASME B 31.3.
 
Thank Bonswa for the tie-in information.

I am working on small bore tie-in 1" to 1". Spec say socket weld.Servie is bleed gas 40 psi and 500F.

The tie in is for pressure sensor. I am asking if it is ok to cut the pipe and install a 1" SW tee and call both SW "closure weld".

Other options are:

1. Flange + tee +flange
2. block valve + tee + block valve

I am asking what is the general practice for small bore tiein.