Rsd789
Structural
- Aug 30, 2023
- 16
I have a project with a new client for a storage building that's constructed out of load bearing cold formed steel framing. The client is saying in the past they've seen the lateral system comprised of 29ga sheathing and the studs being spaced at 30" O.C.
Based on the AISI S240 I'm seeing that the maximum spacing of the studs needs to be 24" O.C. and the smallest allowable sheathing is 26ga. I've called a few companies who manufacture 29ga sheathing and no one has a sheathing capacity. Does anyone know of any code provisions that would allow us to justify the clients expectations?
Thanks,
Based on the AISI S240 I'm seeing that the maximum spacing of the studs needs to be 24" O.C. and the smallest allowable sheathing is 26ga. I've called a few companies who manufacture 29ga sheathing and no one has a sheathing capacity. Does anyone know of any code provisions that would allow us to justify the clients expectations?
Thanks,