Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

cold joint

Status
Not open for further replies.

hawraz

Civil/Environmental
Feb 25, 2016
1
Hello

i Got situation at concrete work a big storm came and removed some place of form work and we stopped casting at floor 27 (level 80.4m) some of beams are half full the depth of slab is 14cm and beams 40cm what is your advice should i remove this part of hit epoxy and cast another part ?
thanks for all
IMG_8462_tdkb5e.jpg
 
Replies continue below

Recommended for you

Sorry to say it, but I think all that concrete has to be chipped out, and start again.
 
I'd agree with hokie - start chipping as soon as possible.

Check out Eng-Tips Forum's Policies here:
faq731-376
 
Agreed, the cost of trying to salvage what was poured and the delays to the project trying to work out the repair procedure will exceed the cost of demo and replacement. A hydroblasting machine might be your best bet to clear out the concrete without damaging the reinforcement.

Professional and Structural Engineer (ME, NH)
American Concrete Industries
 
I might do the hyrdroblasting for the slab but avoid the column areas as I wouldn't want to damage the column concrete below which I presume is good to go.



Check out Eng-Tips Forum's Policies here:
faq731-376
 
Yeah, hand lances horizontally/diagonally into the columns would probably work well enough and would hopefully leave an acceptable cold joint surface.

Professional and Structural Engineer (ME, NH)
American Concrete Industries
 
Agree with above. Start over. Expensive lesson in weather-watching.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor