Chewi00
Geotechnical
- Aug 3, 2004
- 60
Contractor is proposing to use cold formed piles in lieu of hot rolled piling that was specified. THis is for a combination bulkhead wall. Looking for general pro's and con's between the two types. My familiarity is soley with hot rolled piling.
THanks in Advance,
Adam
THanks in Advance,
Adam