Hi,
I’m currently in the middle of a project with an astonishingly poor concreting crew.. We’re halfway up the RC frame and now I’ve found out that they’ve built one of the columns off-plumb and off position.
I’ve reviewed their surveys, checked the P-Delta effect and it overstresses the column by just over 10% which I’m not happy with.. The other problem is they now have 2 flat slab levels poured above this!
My initial feeling is to perhaps increase the column area and then wrap the column in GFRP. Anyone had anything similar happen on a site?
I’m currently in the middle of a project with an astonishingly poor concreting crew.. We’re halfway up the RC frame and now I’ve found out that they’ve built one of the columns off-plumb and off position.
I’ve reviewed their surveys, checked the P-Delta effect and it overstresses the column by just over 10% which I’m not happy with.. The other problem is they now have 2 flat slab levels poured above this!
My initial feeling is to perhaps increase the column area and then wrap the column in GFRP. Anyone had anything similar happen on a site?