ptmoss
Civil/Environmental
- Mar 30, 2002
- 97
Do people have a standard preference for using either standard proctor or modified proctor for checking compaction along waterlines? I've been doing some inspections where the spec's in the waterline detail call out for compacting to 95% modified proctor yet the state DOT and town highway dept. all have there own spec's which use standard proctor.
The project is replacing an 80-yr old waterline with a new ductile iron line and re-using the existing backfill in the trench, except for new gravel base for the road.