tabiscari
Mechanical
- Mar 12, 2013
- 3
Greetings
We are designing a Fuel Oil Tank
ID= 220 ft
H= 64 ft
Roof: Structurally supported cone roof
Bottom: Apex up, 1:120 slope (center is higher than periphery)
We are having a problem with the tank drainage:
The client request the complete drain of Tank in case of maintenance: to accomplish this, we suggested 4 draw-off sumps of 6" each nozzle.
1) How close can the sumps be between them?
As drainage lines are steam traced, they cannot be underground by Project Specs, given this situation, we have considered to gather all 4 drainage lines (and sumps) as close as possible not to interfere with other shell connection between drain nozzles
2) Is it possible to put more than one pipe inside a sump?
3) Table 5-16 of API 650 establishes NPS 6" as maximum, but paragraph 5.8.7 gives an open window to the purchaser, could be installed a single drain nozzle of 12"?
Thanks
We are designing a Fuel Oil Tank
ID= 220 ft
H= 64 ft
Roof: Structurally supported cone roof
Bottom: Apex up, 1:120 slope (center is higher than periphery)
We are having a problem with the tank drainage:
The client request the complete drain of Tank in case of maintenance: to accomplish this, we suggested 4 draw-off sumps of 6" each nozzle.
1) How close can the sumps be between them?
As drainage lines are steam traced, they cannot be underground by Project Specs, given this situation, we have considered to gather all 4 drainage lines (and sumps) as close as possible not to interfere with other shell connection between drain nozzles
2) Is it possible to put more than one pipe inside a sump?
3) Table 5-16 of API 650 establishes NPS 6" as maximum, but paragraph 5.8.7 gives an open window to the purchaser, could be installed a single drain nozzle of 12"?
Thanks