I have a situation where the plans call for a 3 inch slab thickness and 1 1/2" form deck was installed instead of 9/16" specified. Joist spacing is 2'-0". The 1 1/2" deck itself is strong enough to carry service loads. I am concerned about less than 2" cover over flutes. Can the concrete be considered non structural filler and use a light gage mesh to keep it from cracking?