ben3929
Civil/Environmental
- Jan 20, 2010
- 35
I am working on a project to install industrial shop in an existing storage area. Existing floor in the storage area is 18 inch thick asphalt pavement and the shop needs a concrete pavement. golf carts and forklifts will be operated over the new concrete pavement. I was told to remove 6" of the existing asphalt and fill with concrete pavement. I am concerned if the remaining asphalt is crumble and create problems for the concrete. Any thoughts please.