martin888888
Civil/Environmental
- Jun 15, 2010
- 157
Have a generic question on the basic design of concrete pavement. I have seen large concrete slabs designed with just call outs for the boundary of the slab, and then I have seen slabs designed showing 20'x20' construction joints. I dont think they would ever pour a 200'x200' slab and every applicaton would have construction joints. Anyone have any imput into what the proper way to show this would be or the application of construcion joints in concrete pavement construction.
The application I am talking about in this case is an industrial yard.
Thanks
The application I am talking about in this case is an industrial yard.
Thanks