Hello
If i have a slab concrete pouring, say a total amount of 150 cubic meters. concrete will be delivered to site through trucks, each of a capacity ranging from 6 - 8 m3 on average. which means that around 20 trucks will come.
my question is, on what basis should depend when choosing cars for slump and compressive strength test spcimens sample collection. should i check slump of each car of all the 20 cars? or there is a process by which i choose a certain number of cars for sample collection? and how may compressive strength test spcimens should i do? 6 is a minimum right?
thank you.
If i have a slab concrete pouring, say a total amount of 150 cubic meters. concrete will be delivered to site through trucks, each of a capacity ranging from 6 - 8 m3 on average. which means that around 20 trucks will come.
my question is, on what basis should depend when choosing cars for slump and compressive strength test spcimens sample collection. should i check slump of each car of all the 20 cars? or there is a process by which i choose a certain number of cars for sample collection? and how may compressive strength test spcimens should i do? 6 is a minimum right?
thank you.