jcali
Structural
- Sep 5, 2003
- 39
I need to specify a structural slab on metal deck. The slab will have an adhered finish that requires a very low moisture content. What can I do to achieve a low moisture content in a timely manner, without waiting months for a curing process? Will a vented deck help?
-JCali
-JCali