Hi Everyone,
I am working on a school that for cost reasons the concrete basement walls will be left exposed. What are the options for finish grades? How is that correctly specified? I am assuming we will have a mid-level finish: Wall being planar,no bulges, blemishes, honey combs, some regular formwork joint and tie pattern and such
Thank you
Eric McDonald, PE
McDonald Structural Engineering, PLLC
I am working on a school that for cost reasons the concrete basement walls will be left exposed. What are the options for finish grades? How is that correctly specified? I am assuming we will have a mid-level finish: Wall being planar,no bulges, blemishes, honey combs, some regular formwork joint and tie pattern and such
Thank you
Eric McDonald, PE
McDonald Structural Engineering, PLLC