eit09
Civil/Environmental
- Jul 8, 2009
- 183
I have a footing that is siting on granite. Do to the large uplift loads I plan on having them drill into the granite and place a few dowles then fill the holes up with concrete or grout. I am trying to figuire out what type of strength (skin friction) between the rock and concrete interface. Does any one have a reference or simialr situation that could point me in the right direction?