jeff97070
Mechanical
- Feb 14, 2013
- 52
Hello,
For years and many many products we would call out the Pemnut used in a sheet metal part as a flagged note like flag note 8 4X Pem M4X install farside. Then in the drawing view we would point to the hardware location with a flag.
A new person now say's industrial standard is to make an assemble of the sheet metal part and assembly the actual Pemnut model then add this assembly view in the fab drawing and then add a bill of materials, item one would be the part number of the sheet metal fab drawing and item 2 would be for the Pemnut.
Can someone tell me which one is preferred, again the way we have done this for 20 plus years has worked fine using flagged notes.
Thank you,
Jeff
For years and many many products we would call out the Pemnut used in a sheet metal part as a flagged note like flag note 8 4X Pem M4X install farside. Then in the drawing view we would point to the hardware location with a flag.
A new person now say's industrial standard is to make an assemble of the sheet metal part and assembly the actual Pemnut model then add this assembly view in the fab drawing and then add a bill of materials, item one would be the part number of the sheet metal fab drawing and item 2 would be for the Pemnut.
Can someone tell me which one is preferred, again the way we have done this for 20 plus years has worked fine using flagged notes.
Thank you,
Jeff