Hi All,
I am completing a study on the potential for connecting an existing CHP plant, which supplies power locally to my site, to the national grid to sell surplus power to the grid. I simply need to know what new infrastructure I would need to install to make this connection.
- Do I need to install a new power line back to the grid or can the existing grid power supply line be used?
-Do I need a new metering unit to measure the power I supply to them?
-Any other equipment required?
I assume the best port of call is to speak to the grid operator, but any information up from would be great.
The scientist describes what is; the engineer creates what never was.
I am completing a study on the potential for connecting an existing CHP plant, which supplies power locally to my site, to the national grid to sell surplus power to the grid. I simply need to know what new infrastructure I would need to install to make this connection.
- Do I need to install a new power line back to the grid or can the existing grid power supply line be used?
-Do I need a new metering unit to measure the power I supply to them?
-Any other equipment required?
I assume the best port of call is to speak to the grid operator, but any information up from would be great.
The scientist describes what is; the engineer creates what never was.