lrhg
Structural
- Apr 16, 2008
- 38
I'm working on a reinforced concrete pedestrian/service tunnel located under a street to connect the basements of two exisitng buildings. The tunnel is 350 long, 15' wide, 15' tall. The floor of the tunnel is 18" thick, T & B reinforcement, primary load is hydrostatic uplift, as the tunnel is below the water table.
I would appreciate input on recommendations for construction joint spacing and control joint details in the tunnel floor. Floor is subjected to wheel loads from forklifts.
Thanks.
I would appreciate input on recommendations for construction joint spacing and control joint details in the tunnel floor. Floor is subjected to wheel loads from forklifts.
Thanks.