LocalCM808
Civil/Environmental
- Jun 28, 2017
- 5
Would you wait until you receive the compressive strength test results before paying the Contractor 100% of concrete or shotcrete work? Our city specs are not very clear on this section. Some say pay a portion some say wait until the results pass the spec requirement. The work is completed in place but afraid if payment is made and test fails then it will difficult to have the contractor redo the work. Thanks.