dixib
Mechanical
- Dec 1, 2011
- 21
Hi
Is it possible to continue a simulation in a new system. I know you can do sub-modelling, but what I "simply" want to achieve is instead of having say four load steps in one simulation, I want the first two in one system and the last two in a second system. I have several simulations that have identical first load steps, and being able to simply link the result of the first load steps to other systems and continue the simulation with different setups could safe significant time.
Thanks in advance.
Is it possible to continue a simulation in a new system. I know you can do sub-modelling, but what I "simply" want to achieve is instead of having say four load steps in one simulation, I want the first two in one system and the last two in a second system. I have several simulations that have identical first load steps, and being able to simply link the result of the first load steps to other systems and continue the simulation with different setups could safe significant time.
Thanks in advance.