DCBII
Structural
- Apr 15, 2010
- 187
I have a 1-story Special Reinforced Masonry Shear Wall building where the electrical contractor cut through the diaphragm chord reinforcement multiple times to make openings for conduit. Looking for ideas on how to repair this. The chord steel also acts as horizontal reinforcement for the shear wall.