Hey Folks,
Anyone now of a really cheap montior for control power status?
I have a job that has ten feeders with ten separate CPT's on each feeder and the design engineer has requested that the 120VAC secondary of each CPT be monitored... this is lots of $ for something we have never done here before...
I have checked with AB and Carlo Gavazzi and found a couple however they are in the $200-$300 dollar range.
Anyone have experience with this?
Regards,
TULUM
Anyone now of a really cheap montior for control power status?
I have a job that has ten feeders with ten separate CPT's on each feeder and the design engineer has requested that the 120VAC secondary of each CPT be monitored... this is lots of $ for something we have never done here before...
I have checked with AB and Carlo Gavazzi and found a couple however they are in the $200-$300 dollar range.
Anyone have experience with this?
Regards,
TULUM