mohtogh
Chemical
- Feb 21, 2001
- 144
Hello,
For rough estimation,do you have a general rule for cost estimation of a control system of a chemical plant, with a specified control points?(e.g. 2point pressure control,50 points temperature control ...)
Thanks
For rough estimation,do you have a general rule for cost estimation of a control system of a chemical plant, with a specified control points?(e.g. 2point pressure control,50 points temperature control ...)
Thanks