qpac
Civil/Environmental
- Feb 22, 2008
- 1
I'm modeling a flood plain were the main channels are massive drainage ditches running along the road. At one point the ditch on the left stops and there is a box culvert that runs under the road to the a ditch on the other side of the road. Both ditches handle the 100 year flood, however the culvert does not. How should I model this? Does the ditch on the left, which basically dead ends, act as a detetion basin until it over tops the road and flows into the ditch on the right. The Box culvert runs perpindicular to the general direction of flow. What is the best way to model this scenerio?