jike
Structural
- Oct 9, 2000
- 2,160
Concrete specs normally call for maintaining the concrete in a damp condition for 5 days at 70 degrees or 7 days at 50 degrees F. I believe that this is for 28 day concrete.
If I want to use say 3000 psi at 5 days, how should the above requirement be changed?
If I want to use say 3000 psi at 5 days, how should the above requirement be changed?