Hello,
Is it possible in Abaqus to adjust the increments based on the specific time interval?
I have a total step time of 1, between 0.23 and 0.26 I have a maximum with a very steep slope.
I'd like to use maximum time increments of 0.1 or 0.05 globally and for the specific interval of 0.23 - 0. 26
maximum increments of 0.005. To be able to do this would save me a lot of time. I looked up in the keyword
reference manual but could only find the INC keyword which doesn't help.
Is it possible in Abaqus to adjust the increments based on the specific time interval?
I have a total step time of 1, between 0.23 and 0.26 I have a maximum with a very steep slope.
I'd like to use maximum time increments of 0.1 or 0.05 globally and for the specific interval of 0.23 - 0. 26
maximum increments of 0.005. To be able to do this would save me a lot of time. I looked up in the keyword
reference manual but could only find the INC keyword which doesn't help.