nav1976
Civil/Environmental
- Jan 15, 2000
- 5
I have some problem realtd to water transmission and distrubution system. We have coverage that of TIN converted and polygons r of triangle shape having node to whom data is attached reagarding elevation. In the centre of Polgon we have label whose elevation we have to calculte using interpolation method so that both the elevation of corner nodes and label at centre are compared and anlaysis can b done further.
Now problem is time is consuming in calculating elevation of centre label of polgon manullay by interpolation method.
Can we automate the calculation using AML or using avenue? if yes?how
please help me .