On an earlier project a contractor cot a 12" HC Plank in half. The HC Plank is supported and the remaining two parts have about 4x the reinforcing needed and are over reinforced.
Is it necessary to core drill to cut the added strands at 4' centres is so?
I'm trying to reach out to the precaster.
I can't get away for a bit.
-----*****-----