mrgaee
Mechanical
- Jun 19, 2006
- 4
A reheat pipe has been operating for approx. 30 years between boiler and turbine. It is proposed to cut the pipe at the turbine end to replace a nozzle. Design of restraints is required to maintain the cold pipe position for rewelding.
The initial construction required cold pulling. My question is whether the initial cold pull will have relaxed after this time and whether, in the cold state, the pipe stresses are due only to pipe self weight.
The initial construction required cold pulling. My question is whether the initial cold pull will have relaxed after this time and whether, in the cold state, the pipe stresses are due only to pipe self weight.