cap4000
Civil/Environmental
- Sep 21, 2003
- 555
I have a 25 foot long M14 x 17.2 built in 1965 which interferes with a door and headroom clearance. The owner would like to cut a 4 foot section out for a new door installation. The 3/4 inch thick top cover plated beam is nominally 14 inches deep and with a 7 inch cut from the bottom it would only have a T top section of 7 inches left. Even if I add 2 new tube steel supports and stiffen the remaining thin web with 2 small channels at the the cut portion in the center of the span Ram Advanse calculates large axial forces thruout the entire beam / truss like section. AISC indicates the max bending stress of only 15ksi as this beam is very thin with a high h/t of 65. The uniform load on the beam is 1.5 kip foot from 40 feet of brick work above. Has anyone ever done something, this scary before?? Appreciate any feedback.