Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

CYME Meter

Status
Not open for further replies.

sky2020

Electrical
May 21, 2019
39
CA
How to define Meter demand hourly usage in CYME? I have the hourly total metering upstream the feeder and not sure how can I put the data as a time-series for a meter.
 
Replies continue below

Recommended for you

If you are doing a load flow, normally you would only input the peak load for each feeder. That could be determined by finding the maximum of the hourly data.
 
I think you're going to need either long term dynamics or load flow with profiles module to do any time series stuff. You will also probably find more support on the Cyme forums.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top