I have been asked to determine the number of 5' lifts that will be required on a concrete headwall that spans across the opening for a tainter gate on a new dam. Specifically, I need to calculate how many lifts need to be in place before the shoring can be removed. The lifts would need to support their own weight as well as the weight of the next 5' lift when poured. I also will need to determine what load the shoring will need to be capable of carrying.
Does anyone know what codes would be applicable to this design. There is very little reinforcing in the headwall and all that there is is located in the first two lifts. The first lift has reinforcing in the skin. The first and second lifts also have reinforcing in the top of the pour that is embedded in the dam piers. This reinforcing does not run the entire span, but rather ends at a distance of 8' from the each pier. The headwall spans 24', so the middle 8' does not have any reinforcing in the tops of these two lifts.
I really appreciate any feedback the community might have.
I have been asked to determine the number of 5' lifts that will be required on a concrete headwall that spans across the opening for a tainter gate on a new dam. Specifically, I need to calculate how many lifts need to be in place before the shoring can be removed. The lifts would need to support their own weight as well as the weight of the next 5' lift when poured. I also will need to determine what load the shoring will need to be capable of carrying.
Does anyone know what codes would be applicable to this design. There is very little reinforcing in the headwall and all that there is is located in the first two lifts. The first lift has reinforcing in the skin. The first and second lifts also have reinforcing in the top of the pour that is embedded in the dam piers. This reinforcing does not run the entire span, but rather ends at a distance of 8' from the each pier. The headwall spans 24', so the middle 8' does not have any reinforcing in the tops of these two lifts.
I really appreciate any feedback the community might have.