defg
Structural
- Jul 7, 2006
- 55
I'm currently supervising a road to be finished with a double surface dressing.The Contractor is now out of 80/100 penetration grade bitumen.He has requested from the Engineer to order 85/100 penetration grade bitumen as the previous supplier has run out of 80/100 penetration grade.Is there any detrimental effect to the work to allow the Contractor to purchase 85/100 instead of 80/100 penetration grade bitumen?Please assist.