Good day
I did a project to remove the flange from discharge nozzle underneath the LPG horizontal Vessel, discharge was welded directly. Now the first flange is located 6m away from the vessel. Please anyone clarify whether long pipe has to be consider as a integral part of the vessel (long nozzle) or after first weld it has to consider as discharge pipe?
Does it defined in ASME VIII or API?
Please help me.
I did a project to remove the flange from discharge nozzle underneath the LPG horizontal Vessel, discharge was welded directly. Now the first flange is located 6m away from the vessel. Please anyone clarify whether long pipe has to be consider as a integral part of the vessel (long nozzle) or after first weld it has to consider as discharge pipe?