Guest
Is there any harm in pouring an ICW 18' high in 3 separate pours because of inexperience and/or to get increased control? The below grade walls could be poured, waterproofed and the perimeter drain tile installed, fill sand spread and topsoil placed and packed to gain a much better footing for outside scaffolding, instead of working 18' off the basement floor.