Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

Demister pad installation

Status
Not open for further replies.

romeolacasandile

Petroleum
Oct 12, 2015
4
0
0
AE
Who is responsible for the final inspection and approval of demister pads installation prior to box up and operation? Is the Process Engineer or Plant Inspection Engineer? We have a very long argument with regards to the responsible person? Kindly help us.
 
Replies continue below

Recommended for you

Normally this is responsibility of the Inspection authority and NOT the process engineer. Inspection authority needs to verify full conformity of the field installation against related drawings and project specifications and seal it with his signature on the RFI sheet (or whatever is the official form and format of the document), of which Process discipline represents just a segment.

Equipment can be boxed up without inspection of the Process engineer within the project team, but it cannot be (and it should not be) boxed up without approval of Inspection authorities.

Dejan IVANOVIC
Process Engineer, MSChE
 
Status
Not open for further replies.
Back
Top