MIStructE_IRE
Structural
- Sep 23, 2018
- 816
Typically in a steel frame (data centre in this case) I would have top of pad foundations anywhere from 450mm to max 600mm below slab level.
In this case I have someone telling me they want top of pad 1m below slab level, which is killing my column effective lengths.
What are you guys typically doing?
In this case I have someone telling me they want top of pad 1m below slab level, which is killing my column effective lengths.