DrainMe
Civil/Environmental
- Apr 10, 2013
- 4
The Geotech Engineer recommended subdrains 10'-OC for a mat foundation, a total of 11 drain tiles running beneath the building. The drain, as specified by the Structural Engineer, to extend 5' from the building. As this building is recessed into a hillside, three sides of the buildings are actually retaining walls. (I am not a structural engineer, so I am not familiar with the design of this building foundation). Therefore, the drains are approximately 20' deep and about .
On the same project, we also another building with subdrains around the footing that are approximately 20' deep.
Now, I am in charge showing all these subdrains on the drainage plan and connecting all subdrains together. The Structural Drawing only shows the detail of the pipes in referenced to the foundations.
Question: Can I have cleanouts that extends 20' to grade? I am not sure how functional these cleanout will be... if not, what other choices do I have?
Any ideas?
On the same project, we also another building with subdrains around the footing that are approximately 20' deep.
Now, I am in charge showing all these subdrains on the drainage plan and connecting all subdrains together. The Structural Drawing only shows the detail of the pipes in referenced to the foundations.
Question: Can I have cleanouts that extends 20' to grade? I am not sure how functional these cleanout will be... if not, what other choices do I have?
Any ideas?