Thoughtclaw
Structural
- Apr 28, 2016
- 54
I've been asked for to give a preliminary size (for bidding purposes) of 12' tall poured walls for a manufacturing company. They're going to be storing heavy materials in each area of the building, and loading and unloading them with bulldozers. The attached sketch shows the anticipated weight in each room, as well as column locations (denoted by circles). They're putting a PEMB on top of the poured walls. My question is, what assumptions would you make for the loads caused by the materials leaning against the walls, as well as the possibility of the machines hitting the walls as they're working? Would anyone happen to know of a good reference for this type of application?