My personal experience has shown that a lot of emphasis is placed on Construction Project Management, with little importance assigned to planning of the Design activities.
I believe that every project is created twice, Mentally at the design stage and Physically at the construction stage, both stages carrying equal importance.
Why therefore is there very little available literature / research / software on Design Planning and Management..... or am I not looking in the right places?
I believe that every project is created twice, Mentally at the design stage and Physically at the construction stage, both stages carrying equal importance.