vehazle
Mechanical
- Nov 13, 2004
- 11
With respect to VIII, Div. 1, who has design responsibility for a vessel? Is it generally the U stamp holder whether they design the vessel themselves or contract the service?
Is there a clear position from the National Board?
The way I view it is that I am hiring the U stamp holder to supply a vessel compliant with the specifications (VIII-1 being one) I give him. My responsibility is to ensure I communicate the design requirements (diameter, length, nozzle sizes/locations/loads, specific material requirements, seismic/wind loading, etc)clearly. The U stamp holder is responsible for ensuring the resulting design takes these requirements into account and complies with both the design and manufacturing requirements of the Code.
Am I completely off base on my view of the design responsibility?
I am interested in what is common experience of other ASME vessel users/specifiers/U stamp holders.
Thank you for any input.
Is there a clear position from the National Board?
The way I view it is that I am hiring the U stamp holder to supply a vessel compliant with the specifications (VIII-1 being one) I give him. My responsibility is to ensure I communicate the design requirements (diameter, length, nozzle sizes/locations/loads, specific material requirements, seismic/wind loading, etc)clearly. The U stamp holder is responsible for ensuring the resulting design takes these requirements into account and complies with both the design and manufacturing requirements of the Code.
Am I completely off base on my view of the design responsibility?
I am interested in what is common experience of other ASME vessel users/specifiers/U stamp holders.
Thank you for any input.