spats
Structural
- Aug 2, 2002
- 655
I'm curious to know what the concensus is out there about structural design reuse fees.
As an example, I am doing a proposal for 12-unit condominium buildings above parking (4-story total), where there will be three identical buildings. The architect wants me to give a fee for the first building only, with reuse fees on the other two buildings. All that's involved in the reuse is changing the title blocks and signing & sealing. Of course, the liability and reponsibility for the two repeats is the same as the original.
In the few instances where I've encountered this in the past, I had settled on a 50% reuse fee, and didn't have any problems. In this case, however, I get the impression the architect is expecting much less.
Another way of looking at it is to say "what would my fee be if they were constructing all three buildings at one time ?". I might have three times the munber of sheets, but not much in the way of additional effort, but again there is the liability (especially condos). Many times I set my fees based not just on the effort involved, but as a percentage of the cost of the building. Based on that senario, the fee would not be discounted at all.
I would appreciate any and all opinions.
As an example, I am doing a proposal for 12-unit condominium buildings above parking (4-story total), where there will be three identical buildings. The architect wants me to give a fee for the first building only, with reuse fees on the other two buildings. All that's involved in the reuse is changing the title blocks and signing & sealing. Of course, the liability and reponsibility for the two repeats is the same as the original.
In the few instances where I've encountered this in the past, I had settled on a 50% reuse fee, and didn't have any problems. In this case, however, I get the impression the architect is expecting much less.
Another way of looking at it is to say "what would my fee be if they were constructing all three buildings at one time ?". I might have three times the munber of sheets, but not much in the way of additional effort, but again there is the liability (especially condos). Many times I set my fees based not just on the effort involved, but as a percentage of the cost of the building. Based on that senario, the fee would not be discounted at all.
I would appreciate any and all opinions.