Designed Ground Water Level for Sheet Pile Wall Design 1

Status
Not open for further replies.

ynnuseel0106

Structural
May 14, 2015
10
Does anyone know why there are two design ground water levels for the design of ELS system? The highest groundwater level is for ULS checking, i.e. overturning, strutural member design, and the lowest groundwater level is for SLS checking, i.e. dewatering settlement. Why a lower ground water level is more critical to induced settlement??
 
Replies continue below

Recommended for you

A lower ground water level will induce more settlement because the effective stresses in the soil increase.
 
I trust your method has appropriate factor of safety of sheet depth against quick conditions at the base of the excavation.
 