Currently at my company, our MRP system determines cost by using a pcs/hr standard. These production rates also generate earned hours which is a nesacery management measurement tool.
Currently our heat treatment operations have the same estimated pcs/hr rate for all products. The cycle time is 8 hrs, regardless of the number of pieces in the furnace. I am trying to implement an accurate measurement tool, which will capture the correct cost as well as generate earned hours.
I have devoloped a formula to determine an accurate cost per piece by using constrait of the furnace, which is weight per cycle. But this method will not generate earned hours which i was told is unacceptable.
Can you have a pcs/hr rate for an operation with an 8 hour cycle time?
Any suggestions are greatly appreciated.
Currently our heat treatment operations have the same estimated pcs/hr rate for all products. The cycle time is 8 hrs, regardless of the number of pieces in the furnace. I am trying to implement an accurate measurement tool, which will capture the correct cost as well as generate earned hours.
I have devoloped a formula to determine an accurate cost per piece by using constrait of the furnace, which is weight per cycle. But this method will not generate earned hours which i was told is unacceptable.
Can you have a pcs/hr rate for an operation with an 8 hour cycle time?
Any suggestions are greatly appreciated.