joan271273
Electrical
- Sep 26, 2000
- 119
Are diesel generator field acceptance tests under load limited by the duty of the unit. Can I do extended test runs to both machines or am I limited by the duty. I understand from NEMA MG standards that 1 hr of a continuous duty machine is not the same as standby duty machine