I have a one-story bldg (masonry/steel framed) placed on engineer fill. The level bldg pad is placed on a sloped grade. The geotechnical consultant states that there will be 1.25" differential settlement, approximately 0.05" of settlement per 12" of bldg length. What is tolerable for differential settlement?
TIA