JohnWeal
Mechanical
- Dec 16, 2012
- 124
Good Afternoon,
The client specifications require the biogas offtake to be a minimum of 1.5m above the sludge liquor level.
Has anyone on this forum experienced foam entering the offtake pipeline and if so, what are the consequences and remedial actions required?
The offtake pipework is DN200 with a maximum gas yield of 370 m3/h
Regards
John