rharashi
Civil/Environmental
- Jul 19, 2007
- 8
I have a client asking me to stamp a drawing for a directional bore underneath a railroad and a 50' wide x 10' deep canal which is not concrete lined. The boring company will be pulling a 10" dia. steel casing through and then a 4" pvc conduit inside of it. The bore would be 10' below the bottom of the canal; thus, 20' below the railroad.
Any suggestions? I'm concerned about water intrusion and possibly the pressure from the railroad. What are the standard procedures for this type of job?
Thanks.