sam74
Civil/Environmental
- Dec 3, 2004
- 310
We have an undeveloped site that currently discharges to an undersized downstream storm water system. That system is a relatively new 12" culvert in a street that discharges into an undersized detention pond. The existing inflow to the system is the street it is in and a 2 acre motel and parking lot. Calculations show that this system currently should flood during the 2yr storm event.
This is our only discharge point when we develop this site. I don't think Hydrocad appears to be modeling the discharge from our site due to backwater effects in either predev or postdev situations although I don't have much to base this on. Normally (in the past) I would be modeling a fix to this situation instead of adding to the problem.
We don't have many options other than to try and release postdev flows at predev rates but how do you know it is modeling this accurately. I do have the Dyn-Stor-Ind reach routing and pond routing methods specified.
Any thoughts?
This is our only discharge point when we develop this site. I don't think Hydrocad appears to be modeling the discharge from our site due to backwater effects in either predev or postdev situations although I don't have much to base this on. Normally (in the past) I would be modeling a fix to this situation instead of adding to the problem.
We don't have many options other than to try and release postdev flows at predev rates but how do you know it is modeling this accurately. I do have the Dyn-Stor-Ind reach routing and pond routing methods specified.
Any thoughts?