New 12/16/20 MVA power transformer with positive pressure nitrogen oil preservtion system. The LV bushings are the Haefely "super draw lead" split conductor style. When installing these, we found a bleader screw at the top. If we open this, the transformer oil will rise to displace the air around the conductor. Is this advisable? I suppose that nitrogen will gradually displace the oil with time. Do regular draw lead bushings also allow this? No mention of this in the manual. Maybe the small amount of air involved is not worth bothering with. Thanks.